Floors That Handle Decades of Use
Bring New Life to Your Home With Beautiful Hardwood Flooring
Many southern New Hampshire homes built between the 1950s and today have subfloors that have settled, warped, or developed weak spots over time. Lojko Hardwood Flooring installs hardwood floors in Merrimack with thorough subfloor assessment and leveling that prevents cupping, movement, and premature failure. This preparation matters because skipping it leads to visible gaps, squeaking, and boards that shift within months of installation.
The installation process begins with inspecting the existing subfloor for moisture, levelness, and structural integrity. Any uneven areas are leveled before hardwood goes down, and transition strips are fitted to adjacent rooms and doorways. Furniture moving is included, and timelines are set based on actual project conditions rather than optimistic estimates.
Schedule a property evaluation to assess your subfloor condition and discuss hardwood options.
What Proper Installation Requires
Hardwood installation begins with moisture testing and subfloor inspection to identify any areas that need reinforcement or leveling. Planks are acclimated to your home's humidity levels before installation, and each row is checked for alignment and fit. Installation includes underlayment selection based on your subfloor type, whether it's plywood, OSB, or concrete in basement applications.
After installation, you'll notice floors that feel solid underfoot without flex or squeaking, boards that sit flush with no gaps at transitions, and a surface that remains stable through seasonal humidity changes. Lojko Hardwood Flooring includes installation labor warranty, which covers workmanship issues separate from material defects. Properly installed hardwood lasts decades when the foundation is addressed correctly at the start.
The service covers both new construction projects and retrofit installations in occupied homes. Installation timelines depend on room size, subfloor condition, and acclimation needs, with realistic scheduling communicated before work begins. Furniture is moved back into place once the floor is ready for use.
Questions Homeowners Ask Before Installation
These questions come up frequently during consultations, especially from homeowners replacing old flooring or upgrading from carpet in older Merrimack-area properties.
What happens if my subfloor isn't level?
Subfloor leveling is completed before any hardwood installation begins, using leveling compound or plywood shims depending on the severity of unevenness, which prevents boards from rocking or separating over time.
How long does hardwood installation take for an average room?
Installation timing depends on subfloor prep needs and room size, but most single-room projects are completed within two to three days once materials are acclimated.
Does hardwood installation work in basements?
Hardwood can be installed in dry basements with proper moisture barriers and climate control, but vinyl plank is often recommended for below-grade spaces in Merrimack due to seasonal moisture fluctuations.
What's included in the installation service?
The service includes subfloor assessment and leveling, underlayment, hardwood plank installation, transition strips, furniture moving, and cleanup after the work is finished.
How do I know if my existing floor needs replacement or just refinishing?
If the wood surface is worn but boards are still structurally sound and flat, refinishing extends the floor's life without removal, but cupping, warping, or water damage typically requires replacement.
Lojko Hardwood Flooring has provided hardwood installation services in Merrimack and surrounding communities for 30 years, handling both new builds and older homes with subfloor challenges. Request a detailed estimate based on your current floor condition and room layout.

